JEK2 New Nuclear at Krsko

Developer
GEN energija
Capacity
2400 MWe
Last updated
8/11/2026

Project overview

Reactor type
PWR
Announced
2/18/2026
Projected operational
12/31/2041

Notes

Slovenia's JEK2 project is for a new one or two-unit nuclear power plant with up to 2400 MW capacity adjacent to the existing Krsko NPP. Technical feasibility studies completed in September 2025 confirmed both AP1000 and EPR/EPR1200 are suitable. A referendum is expected late 2027/early 2028. FID is planned for 2029 with operation in 2041.