Home/SMR Projects

Oklo — Atomic Alchemy Radioisotope Production Facility

Developer
Oklo Inc. / Atomic Alchemy Inc.
Capacity
1 MWe
Last updated
7/13/2026

Project overview

Reactor type
SFR
Announced
2/28/2025
Projected operational
12/31/2026

Notes

Oklo acquired Atomic Alchemy on February 28, 2025 for a total purchase price of $28.4 million ($900K cash plus 820,840 shares of Oklo common stock at $33.39 per share). Atomic Alchemy is pioneering a US-based radioisotope supply chain using its Versatile Isotope Production Reactor (VIPR) technology. The acquisition provides Oklo with diversification into the radioisotope market — estimated at $55.7 billion by 2026 — across healthcare diagnostics, cancer treatment, industrial applications, space, and defence. Long-term synergies exist because Oklo's fast reactors naturally produce radioisotopes as byproducts, and Atomic Alchemy can capture and sell these. Atomic Alchemy intends to be a low-cost US radioisotope producer beginning production in 2026.

SMR Brief Pro members also see:

  • Risk Score: ████████
  • Opportunity Score: ████████
  • Score Rationale: ████████
  • Analyst Notes: ████████
  • Related News: ████████
  • Related Companies: ████████
  • Related Deals: ████████

Get the full intelligence dossier on every SMR project.

Track every SMR project worldwide with SMR Brief Pro

See this in the dashboard →