Home/SMR Projects

RoPower Studsvik CMS5 — Core Design Management System

Developer
RoPower Nuclear / Studsvik Scandpower
Capacity
462 MWe
Last updated
8/11/2026

Project overview

Reactor type
PWR
Announced
12/9/2025
Projected operational
12/31/2031

Notes

RoPower Nuclear selected Sweden's Studsvik's Core Management System 5 (CMS5) as the methodology to support core design evaluation and verification for Romania's first SMR project on December 9, 2025 (NEI Magazine). CMS5 will equip RoPower to perform design evaluation and verification of the six-module NuScale plant's core and operational safety. The order was not expected to have a material financial impact on Studsvik Group results in 2025. The selection demonstrates the depth of supply chain and engineering services now being assembled for the Doicești project.

SMR Brief Pro members also see:

  • Risk Score: ████████
  • Opportunity Score: ████████
  • Score Rationale: ████████
  • Analyst Notes: ████████
  • Related News: ████████
  • Related Companies: ████████
  • Related Deals: ████████

Get the full intelligence dossier on every SMR project.

Track every SMR project worldwide with SMR Brief Pro

See this in the dashboard →