Home/SMR Projects

Bharat SMR-200 (BSMR) — India

Developer
Nuclear Power Corporation of India (NPCIL) / Bhabha Atomic Research Centre (BARC)
Capacity
200 MWe
Last updated
4/27/2026

Project overview

Reactor type
PWR
Announced
1/1/2024
Projected operational
12/31/2035

Notes

NPCIL and BARC are jointly developing the Bharat SMR-200 (BSMR-200) — a 200 MWe pressurised heavy water reactor using slightly enriched uranium with passive safety features. NPCIL signed an MOU with Engineers India Limited in 2025 for engineering services on the BSMR conceptual design. India envisions 100 GW of nuclear capacity by 2047 with the BSMR central to plans for replacing retiring coal plants and powering remote industrial sites. The design leverages India's decades of PHWR operating experience.

SMR Brief Pro members also see:

  • Risk Score: ████████
  • Opportunity Score: ████████
  • Score Rationale: ████████
  • Analyst Notes: ████████
  • Related News: ████████
  • Related Companies: ████████
  • Related Deals: ████████

Get the full intelligence dossier on every SMR project.

Track every SMR project worldwide with SMR Brief Pro

See this in the dashboard →