Last Energy PWR-20 — South Wales Llynfi Site UK

Developer
Last Energy
Capacity
80 MWe
Last updated
8/11/2026

Project overview

Reactor type
PWR
Announced
10/1/2024
Projected operational
12/31/2029

Notes

Last Energy obtained site control at the Llynfi site in South Wales in October 2024 and plans four PWR-20 microreactor power plants (4 × 20 MWe = 80 MWe total) at the site. The UK's nuclear regulators (ONR, Environment Agency, and Natural Resources Wales) completed a Preliminary Design Review (PDR) of the PWR-20 in June 2025 — the first nuclear developer to complete a PDR in the UK. Last Energy is on track for a site licence decision by December 2027. The company is the only known developer with a regulator-confirmed pathway toward a potential 2027 UK site licence. The PWR-20 is a 20 MWe (60 MWt) single-loop pressurised water reactor using standard full-length PWR fuel enriched to 4.95%, fabricated, transported, and assembled within 24 months.

SMR Brief Pro members also see:

  • Risk Score: ████████
  • Opportunity Score: ████████
  • Score Rationale: ████████
  • Analyst Notes: ████████
  • Related News: ████████
  • Related Companies: ████████
  • Related Deals: ████████

Get the full intelligence dossier on every SMR project.

Track every SMR project worldwide with SMR Brief Pro

See this in the dashboard →