Home/SMR Projects

Stable Salt Reactor Wasteburner

Developer
Moltex Energy Canada Inc
Capacity
300 MWe
Last updated
6/22/2026

Project overview

Reactor type
Molten Salt Reactor
Announced
1/1/2014
Projected operational
6/1/2034

Notes

The SSR-W is a molten salt fast reactor that consumes transuranic elements from used CANDU fuel. Peer-reviewed research confirms the SSR-W can consume the vast majority of transuranic elements, reducing waste volumes, radiotoxicity and heat generation. The 300 MW demonstration unit is planned for Point Lepreau site in New Brunswick by early to mid-2030s. The WATSS recycling process was validated on used CANDU fuel at Canadian Nuclear Laboratories, demonstrating 90 percent extraction of transuranic material in 24 hours. Canadian Nuclear Safety Commission Phase 1 Vendor Design Review completed.

SMR Brief Pro members also see:

  • Risk Score: ████████
  • Opportunity Score: ████████
  • Score Rationale: ████████
  • Analyst Notes: ████████
  • Related News: ████████
  • Related Companies: ████████
  • Related Deals: ████████

Get the full intelligence dossier on every SMR project.

Track every SMR project worldwide with SMR Brief Pro

See this in the dashboard →