Rosatom

Moscow, Russia
Active
Multiple

Company overview

Founded
1992
Total funding
State-owned
Technology
Multiple

About

Rosatom State Atomic Energy Corporation provides integrated nuclear-energy offerings that include plant design and construction, fuel supply, operations and maintenance, spent-fuel and radioactive-waste management, and decommissioning. Its portfolio includes Generation III+ VVER plants and land-based and floating SMR solutions built around the water-cooled RITM-200N reactor. In June 2026, construction began on Uzbekistan's first integrated nuclear power plant after the regulator issued a construction licence for an RITM-200N unit; the planned project comprises two VVER-1000 units and two 55-MWe RITM-200N units.

Key investors

Russian Federation Government

Projects developed by Rosatom

Akkuyu Nuclear Power Plant Unit 4
🇹🇷Turkey
Under Construction
1200 MWe
RITM-200 — Yakutia
🇷🇺Russia
Under Construction
55 MWe
SMR Programme — Uzbekistan
🇺🇿Uzbekistan
Planning
300 MWe
Laos Nuclear Power Plant
🌐Laos
Planning
—
Armenia Metsamor Unit 2 Life Extension to 2036
🌐Armenia
Operational
416 MWe
Akkuyu Nuclear Power Plant Units 1-4
🇹🇷Turkey
Under Construction
4800 MWe
Leningrad II-4 (Unit 8)
🇷🇺Russia
Under Construction
1200 MWe
Rosatom PEB-100 Floating Nuclear Units — North Halmahera, Indonesia
🇮🇩Indonesia
Planning
200 MWe
Rooppur Nuclear Power Plant Units 1 and 2 — Bangladesh
🇧🇩Bangladesh
Under Construction
2400 MWe
Rwanda — Rosatom SMR and Nuclear Science and Technology Centre
🌐Rwanda
Planning
—
RITM-200 Land-Based — Multiple Russia Sites
🇷🇺Russia
Under Construction
220 MWe
El Dabaa Nuclear Power Plant Units 1-4
🇪🇬Egypt
Under Construction
4800 MWe
Leningrad II-4
🇷🇺Russia
Under Construction
1200 MWe
Paks II Nuclear Power Plant
🇭🇺Hungary
Under Construction
2400 MWe
Kudankulam Nuclear Power Project Units 5 and 6
🇮🇳India
Under Construction
2000 MWe
Kazakhstan Balkash Nuclear Power Plant — Russia EPC
🇰🇿Kazakhstan
Planning
2400 MWe
El Dabaa Nuclear Power Plant Unit 2
🇪🇬Egypt
Under Construction
1200 MWe
El Dabaa Nuclear Power Plant Unit 4
🇪🇬Egypt
Under Construction
1200 MWe
Akkuyu 1
🇹🇷Turkey
Under Construction
1200 MWe
El Dabaa Nuclear Power Plant Unit 3
🇪🇬Egypt
Under Construction
1200 MWe
El Dabaa Nuclear Power Plant Unit 1
🇪🇬Egypt
Under Construction
1200 MWe
Akademik Lomonosov Floating NPP
🇷🇺Russia
Operational
70 MWe
Myanmar SMR — Rosatom Cooperation
🌐Myanmar
Planning
0 MWe
Akkuyu Nuclear Power Plant Unit 1
🇹🇷Turkey
Under Construction
1200 MWe
Akkuyu Nuclear Power Plant Unit 2
🇹🇷Turkey
Under Construction
1200 MWe
Akkuyu Nuclear Power Plant Unit 3
🇹🇷Turkey
Under Construction
1200 MWe
Ninh Thuan Nuclear Power Project
🇻🇳Vietnam
Planning
4000 MWe

SMR Brief Pro members also see:

  • Funding & Deals tracker entries: ████████
  • Analyst Notes: ████████
  • Risk Assessment: ████████
  • Related Regulatory Events: ████████
  • Opportunity Score: ████████
  • Related News: ████████

Get the full intelligence dossier on every SMR developer.

Track every SMR developer worldwide with SMR Brief Pro

See this in the dashboard →